Abstract
Harima Works was commissioned in 1966 firstly introducing the Imperial Smelting Process (simulataneouszinc and lead smelting process) in Japan.Most part of the plant, however, was designed by Sumitomo taking accumulated technologies of its long and extensive experience in copper and nickel smelting operations.It was built as a smelter complex consisting of not only a sinter and ISF plant but also a zinc & leadrefinery.The SO2 gas is sent to the acid plant of a neighbouring chemical company.The ISF has a shaft area of 15.3m2 which is smaller than the standard one of 17.2m2 and the initial capacity was designed to produce 3000T/M of zinc and 1500T/M of bullion.The operation has been smooth and stable since the start-up.The production capacity has been stepped up to 6600T/M of zinc and 2500TIM of bullion with accumulation of various modifications and improvements through twenty years' operation.As a result, Harima Works has established its position as one of the most successful among the thirteen ISP factories in eleven countries in the world.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: Journal of the Mining and Metallurgical Institute of Japan
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.