Abstract
PurposeThe purpose of this paper is to prioritize and establish relationships among the barriers that affect green, lean and Six Sigma (GLSS) implementation in the Indian construction sector.Design/methodology/approachA hierarchal model consisting of several levels is generated by the interpretive structural modelling (ISM) methodology. For establishing the priority weights and the ranking of the barriers, the relationships among barriers from the model in ISM are used to provide an output from the analytic network process (ANP). The 12 vital barriers that affect implementation of GLSS adoption were shortlisted from literature and then finalized in consultation with experts belonging from both industry and academia.FindingsBased on the ISM model “Lack of awareness for green products, Lack of top management commitment and involvement as well as Lack of funds along with an improper estimation” are at the highest level. Similar results were found while ranking the barriers through ISM–ANP integration.Originality/valueThis study identified and prioritized the barriers that affect GLSS implementation using ISM–ANP approach, such a study has not been attempted previously for the construction sector. The ISM model and ANP ranks are based on the inputs gathered from experts and academicians so as to ensure practical validity. This approach is assists decision-makers to focus on the key barriers priority basis and enables them to implement GLSS smoothly.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.