Abstract

With the progress of distributed generators, island partition gradually meets the requirements of practical engineering application. In this study, according to the radial structure and service restoration process of intelligent distribution system, this paper established the island partition model takes account of key factors as the load priority, load controllability, power balance and equipment transmission capability, especially considering the DG which output power is random, and reliability of many types of DGs. Different from traditional method to solve the model, this paper used the mathematical optimization method to get island scheme. The proposed method and model is verified with a 33-bus test system with different types of DGs. Comparison with other methods demonstrates that the new model and method is feasible and valid.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.