Abstract

Mine closure in the Witwatersrand Goldfields of South Africa has resulted in an acid mine drainage (AMD) legacy that is difficult to manage and costly to address. As a short-term measure, three large high-density sludge (HDS) plants were erected that treat 185 megalitres of AMD per day (ML/day), at great cost to taxpayers. Longer-term solutions are sought, as the salt load to the Vaal River System is unacceptable. Long-term modelling was used to assess whether the untreated and HDS-treated AMD could be used for irrigation and to determine the scale of the potential opportunity. The Goldfields waters are not very acidic, and simulations indicate it should be feasible to utilise even the untreated water for irrigation, especially if growers commit to applying limestone to their fields. HDS treatment lowers the corrosivity and trace element concentrations, and because the water is gypsiferous, double cropping will precipitate more than a third of the salts in solution as gypsum in the soil profile, thereby reducing salt load to the water environment. The potential irrigated area depends on the cropping system; it is about 9000 ha for rotational cropping and 30,000 ha for supplemental maize irrigation. It is prudent to seriously consider irrigation as a potential long-term water management option for the Goldfields AMD.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call