Abstract

We consider an optimal investment problem when a firm such as an electric power company has the operational flexibility to expand and contract capacity with fixed cost. This problem is formulated as an impulse control problem combined with optimal stopping. Consequently, we obtain optimal investment timing, optimal capacity expansion and contraction timing, and the investment value. We also show investment, capacity expansion and contraction rule are influenced by the price volatility and the initial capacity is also influenced by the ratio between base-load plant and peak-load plant. In addition, we investigate how time lag between investment and operation influences the investment rule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.