Abstract

An irradiation facility financed by a Cooperative Agreement with the U.S. Dept. of Energy, is near completion in Gainesville, FL. It utilizes a GE-CGR linear accelerator as the irradiation source in a two level design. The lower level has a one meter horn for 10 MeV electrons to irradiate shallow layers of commodities. The upper level has a 2.5 meter horn equipped to produce 5 MeV X-rays to irradiate loads up to pallet size. Automated conveyors transport materials to be irradiated. The facility is divided for irradiated and unirradiated commodities with freezer and refrigerated storage on both sides. The facility is designed for both research and demonstration purposes and has the capacity to irradiate over 10 million Caribbean fruit fly larvae or pupae per minute.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call