Abstract

This study analyses the outcomes of independent power projects (IPPs) across Sub-Saharan Africa. Approximately 20 such projects11This study includes grid-connected projects, greater than 40MW, with a long-term PPA with the utility, which have reached financial close and are under construction, operational, complete or concluded. Short-term rentals are largely excluded from the analysis. have taken root to date, concentrated mainly in 8 countries. A suite of country level and project level factors play a critical role in determining project success, chief among them: the manner in which planning, procurement and contracting are coherently linked, the role of development finance institutions along with the development origins of firms and credit enhancements.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.