Abstract

PurposeThis paper aims to analyse the relationship between the degrees of involvement of key design participants in the decision‐making process of refurbishment projects on the design performance.Design/methodology/approachThe approach takes the form of a literature review of the published journals and textbooks along with a postal questionnaire with professional architects. In total 234 selected professional architects in Malaysia were involved in a postal questionnaire survey. A total of 82 questionnaires or 36 percent were identified as being fit to be used for the data analysis.FindingsThe degree of involvement of key participants are varied at all stages. Greater involvement of key participants is one of the ways to obtain more information on increased integration in the design process. Highest involvement of key design participants was found in the construction stage, which implies that more tasks need to be carried out in refurbishment projects. The involvement of an M&E engineer outside their normal domain in the design process could improve the design performance of refurbishment projects.Research limitations/implicationsThe literature review in the refurbishment design process was rather limited. Only limited study was carried out in specific areas owing to time and cost constraints.Practical implicationsThe paper helps the project manager identify skills and professions that are important in the refurbishment design process, which could improve the completeness and accuracy of design product before work is started on site. This would help to reduce unnecessary design changes during the construction stage. The scale of fees for payment of the architect's services in refurbishment projects needs to be amended so that the amount paid up to contract documentation stage would be reduced from 70 percent to a more reasonable figure.Originality/valueThe paper determines the types of designers that are critically required in refurbishment projects, in order to have a more effective design process and thereby improve the accuracy and completeness of refurbishment design before work is started on site.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call