Abstract


 
 
 
 In investing, there is definitely a risk, as well as the concession of toll roads. Risk analysis is used to anticipate losses due to an element of risk at each investment stage. The results of the analysis show that the highest risk probability for the Solo-Ngawi toll road is land availability and the influence of weather during development and the highest risk impacts are land availability, the potential for revolution in state governance. Based on the results of the analysis, the investment risk level of the Ngawi Solo Toll Road is included in the moderate risk category, so there is a need for cooperation in risk assurance by the Insurance Agency so that the risk level can be reduced to be lower than before. 
 
 
 

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.