Abstract

This paper provides an approach to incorporate planned investments in power grid infrastructure in Germany, which intend to provide the necessary flexibility to integrate large shares of variable renewable energy sources into the power system, into a dynamic stochastic equilibrium model. Since the investments’ economic impact remains unclear, this paper sheds light on two questions: Do power grid infrastructure investments in Germany have the potential to positively impact economic performance, particularly GDP and employment? Is power grid infrastructure investment an efficient way to provide flexibility to the electricity system? We find the potential for negative effects of power grid infrastructure investments on economic outcomes, which can, however, be mitigated by an adequate design of the investments and its framework conditions.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.