Abstract

In a continuous-time framework we study the technology and investment choice problem of a continuous co-digestion biogas plant dealing with randomly fluctuating relative convenience of input factor costs. Input factors enter into the productive process together mixed according to a given initial rule. Being inputs relative convenience stochastically evolving, a successive revision of the initial rule may be desirable. Hence, when the venture starts the manager may or may not install a flexible technology allowing for such option. Investment is irreversible and flexibility is costly. The problem is solved determining in the light of future prospects the optimal revision and then playing backward fixing the investment timing rule.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.