Abstract
Operation of rapidly varying loads such as AC and DC arc furnaces in large industrial power systems will cause voltage flicker on the utility system. System planning will help in determining the available short-circuit duty at the point-of-common-coupling to keep the voltage flicker within acceptable limits. Perceptible flicker limit curves are useful in determining the amount of flicker in a system. Short-circuit voltage depression calculation is one technique to estimate the amount of expected flicker in a system. On-site field tests with equipment that will accurately capture multiple frequencies will aid in measuring the existing voltage flicker. The authors discuss flicker estimation and field tests as well as harmonic filter tuning effects on voltage flicker. The ultimate determination whether unacceptable voltage flicker exists in a system will be complaints from customers served by the utility system actually experiencing objectionable or noticeable flicker.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.