Abstract

Research on the excavation mechanical properties of underpass tunnels has already had certain results, but only a few of them consider the effects of dynamic and static loads on the excavation mechanical properties of underground tunnels at the same time; particularly, there is a lack of research investigating double-line highway tunnels with angled underpasses of existing railway tunnels. In this paper, based on the tunnel project of the new double-line Shiqian Highway Tunnel passing under the Hurong Railway with an oblique angle, based on the method of over-advance geological prediction and investigations into the palm face surrounding the rock, the rock degradation caused by dynamic and static loads is quantified using the perturbation system. Additionally, the mechanical parameters of the rock under the influence of dynamic and static load coupling in the influence area of the cross-tunneling project are determined using the Hoek–Brown criterion, and the mechanical characteristics of the excavation of a tunnel under the double-lane highway tunnel passing under the existing railroad are constructed with the mechanical characteristics of the double-lane highway tunnel, taking into consideration the influence of the dynamic and static load coupling in a three-dimensional model. The results show that, in line with the new tunnel rock movement law for the top of the arch sinking, the bottom plate bulging, the side wall outward movement, the height and width of the arch, and the bottom plate arch show an increase with the tunnel excavation, while the side wall rock displacement effect is smaller; the left and right line tunnel disturbed area of the rule of change is similar; the existing tunnel bottom plate displacement is larger than the top plate and the left and right side wall, under the influence of the excavation time step. Typical profile point displacement is mainly determined by the distance from the excavation surface; von Mises stress extremes are observed in the top plate and side walls of the existing tunnel, which occur in the tunnel structure, and there are unloading and pressure-bearing zones in the bottom plate; the new tunnel has the same rock disturbance angle under the four calculation conditions and, based on the displacement control criterion, the excavation method is preferred and the upper and lower step blasting excavation method is recommended.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.