Abstract

Distributed flexible flowshop scheduling is getting more important in the large-scale panel furniture industry. It is vital for a higher manufacturing efficiency and economic profit. The distributed scheduling problem with lot-streaming in a flexible flow shop environment is investigated in this work. Furthermore, the actual constraints of packaging collaborative and machine setup times are considered in the proposed approach. The average order waiting time for packaging and average order delay rate is used as objectives. Non-dominated sorting method is used to handle this bi-objective optimization problem. An improved encoding method was proposed to address the large-scale orders that need to be divided into sub-lots based on genetic algorithm. The proposed approach is firstly validated by benchmark with other multi-objectives evolutionary algorithms. The results found that the proposed approach had a good convergence and diversity. Besides, the influence of the proportion of large-scale orders priority level and sub-lot size was investigated in a panel furniture manufacturing scenario. The results can be concluded that the enterprise could obtain shorter order average waiting time and delay rate when the sub-lot sizes were set as two and the order priority level was allocated in the proportion of 1:2:3:4:5.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.