Abstract
Abstract Overvoltages caused by switching operation of power system equipments might damage some equipment and delay power system restoration. This paper presents a comparison between transmission line (TL) models for overvoltages study and investigates which TL model is most proper for every case study. Both simulation time and accuracy factors of TL models are considered for selecting best TL model. Various cases of switching of transformer, shunt reactor, capacitor bank, and transmission line are investigated and simulation results for a partial of 39-bus New England test system, show that the proposed TL model evaluation increase accuracy and reduce simulation time (accelerate power system restoration) properly.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: International Journal of Emerging Electric Power Systems
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.