Abstract

ABSTRACT Building S1 is a 12-storey office development site that is situated within London, north of King’s Cross Station. The site directly overlies twin Thameslink rail. The construction activities include: ~3 m of surface excavation; insertion of piles either side of – and between – the tunnels; subsequent loading of the piles; and excavation of a 1-storey deep basement adjacent to the tunnels. The tunnels have live monitoring equipment installed around the lining. The aim of this project is to use the live monitoring data to produce a back-analysed finite element model that accurately predicts the tunnel displacement recorded. The latter is compared with the model of the stages of construction covered by the monitoring. The subsequent stages are modelled in order to have a holistic idea of the behaviour of the site. The model uses the assumptions involved with 2D plane strain, along with assuming homogenous and isotropic geotechnical units. Additionally, the London Clay is modelled with the hardening soil with small strain constitutive model (HSS). Sensitivity analyses show that the small strain parameters of HSS for the London Clay had the most significant effect on tunnel displacement compared with the strength, stiffness and permeability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.