Abstract

The adaptation of nonpowered dams (NPDs) to dams with hydroelectric generation units requires only minor interventions compared with the construction of a completely new dam and power plant. Thus, it is both more economical and has a minimal environmental impact, especially during construction. The aim of this study was to determine the environmental, technical, and economic feasibility of hydroelectric retrofitting projects in the Büyük Menderes basin in Turkey. For this purpose, the economic feasibility and retrofitting potential of 11 NPDs in the basin were investigated using Water Evaluation and Planning (WEAP) software. The results from the energy simulation revealed that the annual average hydropower generation potential and installed capacity for the selected 11 NPDs are 38.7 GWh/year and 4.4 MW, respectively. The total estimated capital investment cost of the 11 retrofit projects was found to be $7.9 million with a total NPV of $25.6 million. In addition, in this study, the leveled electricity cost for each retrofitting project was established and compared with the LCOE values of other renewable energy sources. The findings show that retrofitting NPDs may represent an as yet untapped opportunity to support the global energy transition by providing a cheaper and more environmentally friendly option to pioneer rural electrification.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.