Abstract

In October 1997 Manitoba Hydro experienced the flashover of a FRP hot stick during live line work at 500 kV AC. The paper describes the live line work which was being done, the weather and the condition of the hot stick. A series of tests were made to investigate factors which may have contributed to the flashover. The adequacy of available tests for FRP hot sticks is discussed. The corrective measures which have been taken prior to resuming work of this type are described.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.