Abstract
The preparation of the hearth for repairs (slag pour-off, oxygen blowing of slag-metal residues and drying out) should be carried out as quickly as possible (not more than 40–60 min) with the maximum thermal loading for the furnace.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have