Abstract

The preparation of the hearth for repairs (slag pour-off, oxygen blowing of slag-metal residues and drying out) should be carried out as quickly as possible (not more than 40–60 min) with the maximum thermal loading for the furnace.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call