Abstract

An investigation was made of storm damage during the winter of 1982-83 to the National Park Service's Stinson Beach Park. The investigation included an assessment of the storm damage, evaluation of physical processes contributing to the damage, subsequent beach recovery, and the feasibility of implementing shoreline protection measure to reduce future risk. During the winter of 1982-83, the beach was almost completely denuded of sand, wave overwash damaged the foredune, vegetation on the foredune was destroyed, and backshore flooding occurred. Two structures and a parking lot were endangered as the shoreline receded. Subsequent recovery of the park beach was rapid. By January 1982 sand had moved back onshore and a beach berm was beginning to reform. The foredune and dune vegetation received the only permanent damage. Four shoreline protection alternatives were evaluated. These include no action, dune development/enhancement, construction of a rock riprap revetment, and offshore installation of artificial seaweed. The first costs (estimated costs, excluding maintenance) range from about $90,000 to $475,000. The least-cost protection measure is riprap revetment, which protects the two structures and parking lot endangered during the 1982-83 winter storms. Construction of a foredune along the entire park beach is the highest cost protection measure. If no shore protection action measures are implemented, wave overwash of the foredune can be expected to occur on the average of every 2 to 3 years, and beach degradation, similar to that during the 1982-83 winter, can be expected to occur on the average of every 10 to 12 years. 12 references, 19 figures, 18 tables.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call