Abstract
It has been reported that structures to which impressed current cathodic protection (ICCP) has been applied for a long period have displayed evidence of residual protection when ICCP has been halted, ranging from several days up to significantly longer periods. To study this phenomenon this paper reports the de-activation of a 20 years old ICCP system installed on a 55 years old wharf structure. The ICCP was de-activated for 84 days and the reinforcing steel potentials at locations on the front pile cap and front wall were monitored via the existing installed reference electrodes (RE). The results showed that all the RE installed in the structure initially demonstrated a positive shift in potential, with 61% maintaining a positive trend over the entire trial period.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.