Abstract
The construction industry is one of the key industries for any country. It has been observed that this industry is suffering from sustainable solutions during project execution. It is evident from the literature that most of the construction projects are seriously affected by delays. Pakistan’s construction industry also suffers similar challenges. After the COVID-19 pandemic, the construction industry is experiencing several challenges which have resulted in project delays. Thus, this study investigates the key challenges affecting the timely completion of construction projects. The challenges were discovered from the literature and investigated to analyze their significance towards a sustainable construction project. This study also observes the relationships between the key challenges using Partial Least Squares Structural Equation Modeling (PLS-SEM). A structural model was developed based on the 55 common challenges identified from literature. Data collection was administered through a structured questionnaire survey using a 5-point Likert-scale. The challenges were grouped into six constructs. The outcome reported 20 critical challenges, with information and communication-related factors being the most important challenge in the construction industry. Contract management also significantly affects project time overrun. The created model served as a starting point for academics, researchers, and practitioners to create an effective system for regulating time overrun challenges.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.