Abstract

The transient surge measurements at the changeover sections of Shinkansen power feeding system were carried out in some substations and sectioning posts. The detail of the surge voltage phenomena was investigated and the reason of the frequent discharge of the lightning arrester was clarified. As one of the solutions to avoid such a severe transient phenomena, a novel power supply system for a changeover section substitution for the conventional system with a pair of the vacuum switchgear was proposed. To realize a stable running through the changeover section where two power sources with phase difference are faced, some special control methods were introduced and their validities are confirmed by not only the computer simulations but also the mini-model experiments.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.