Abstract

The Wudongde Reservoir, now being constructed on the lower reaches of the Jinsha River, will be the forth largest hydropower plant in terms of capacity in China. This project includes a concrete arch dam and two large-span underground caverns in both abutments. For their design and construction, in situ stress measurements and geological survey were conducted. In this study, following an introduction of the geological conditions and topography, an interpretation on the test results of in situ stresses is presented for clarifying the distribution features of natural stresses in the engineering area. It is interesting to find that the vertical stress is predominant in the project area and that the horizontal stress reduces largely in the relaxation zone near the bank slopes, while concentrates at the valley bottom and becomes normal in the depth of both abutments. Also analyzed are the effects of valley topography, geological conditions in the project area as well as the macro-regional tectonics on the distribution of in situ stresses at the dam site. A noteworthy finding is that topography and thickness of overburden are the main factors for the intermediate–low stress levels, that regional tectonics governs the stress orientation at the regional scale, and that river erosion, caprock structure and karstic processes have also contributed to the evolution of the valley and in situ stress state.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.