Abstract

Loss of technical performance is one of the main causes of energy shortages and inefficient operation of electrical machines in energy systems. In this study, an analysis of power losses for six selected 33/11 kV distribution feeders was presented. (Kakoba, Ntare, Karamurani, Ishaka MbararaNorth1 and Mbarara North 2) at Mbarara Central Substation Network of UMEME Electricity Distribution Company in Uganda. Data such as cable type, conductor resistance, conductor reactance, and route length were obtained from energy suppliers. From this data, the Gauss-Seidel method was used to determine the total active power and associated reactive power of the entire substation system. The findings showed that the substation is profitable due to the small calculated total power losses. Although it is possible to reduce the total loss to at least 9-12%. Losses were due to old substations, overloaded transformers, and copper losses core losses in lengthy feeder routes. To improve the performance of power distribution networks, it was recommended to replace old conductors to reduce losses.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.