Abstract

Successful delivery of construction of Industrialized Building System (IBS) projects needs an effective supervisor’s that have a combination of strong technical, interpersonal, communication, and managerial skills. Unfortunately, a consistent finding is that there are many factors that affecting site supervision and most construction works are not delivered on time and consequently have a problem during installation of IBS. Therefore, the main aim of the study is to identify the factors affecting site supervision in improving IBS productivity. The study adopts a questionnaire survey approach to elicit information from the respondents, and out of the seventy questionnaires administered fifty-five were retrieved. The information and the data from the questionnaires were analyzed using the average index method. From the finding analysis, the main factors affecting site supervision is on-site construction process. While the main problem during installation of IBS is required planning on time delivery. It is recommended that the quality of IBS product or components should be enhanced to promote better site supervision

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.