Abstract

Cost and time overruns are major issues faced by the construction industry worldwide. Studies have shown that various factors cause these overruns. One of the critical factors that cause these overruns is poor communication. This study aims to study and measure the severity of poor communication in causingcost and time overruns in construction projects. The study adopted two consecutive approaches to study the effect of poor communication in causingcost and time overruns. The first approach was to conduct an extensive literature review to extract causative factors from diverse construction industries that consider poor communication as a causative factor,then to determineits severity percentage,among other factors for each study. From the analysis, it can be concluded that developed countries that apply information communication technology and advanced communication systems have lowerseverity percentages compared to other countries. The second approach was to conduct a qualitative study by interviewing construction experts and to examine their commentsand criticisms ofthe results obtained from the literature. Experts were asked to highlight their views on the severity of poor communication in the construction industry. The outcome of these interviews was thematically analysed. The findings show that poor communication has a significanteffect on cost and time overruns in construction projects.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.