Abstract

Controlling cost in construction projects is an essential issue. This study investigates the most critical problems that cause weakness in cost control in Iraqi construction projects. The quantitative technique was used by conducting a survey directed to professionals who work on construction projects. One hundred and sixty-four questionnaire forms were distributed to private sector companies, government companies, and government institutions, and the responses were subjected to the required statistical analysis. The results indicate that the most influential factors are the weakness in keeping up with the use of modern concepts, methods, and technologies, the delay in receiving the amounts due for work done from the owner, fluctuations in market prices, the lack of knowledge and the inefficient use of currently available tools and technology, and the security situation in the country. The results indicate that the Iraqi construction projects suffer from weakness in cost control, which causes them to stop or delay their delivery, and this needs serious and quick solutions. One of the most important solutions is the adoption of modern technologies and their inclusion in the construction sector and the development of special systems for managing costs that are appropriate to the Iraqi construction environment.

Highlights

  • A construction project will be successful if its technical goals are aligned with its budget and the budget is not exceeded

  • It is difficult to envisage a construction project being completed without cost variances and schedule delays, which may occur at any time during the procedure due to various factors such as poor management, supervision, and control [1]

  • The second part includes a list of factors that are probable to have a negative impact on the control of the cost of a construction project

Read more

Summary

INTRODUCTION

A construction project will be successful if its technical goals are aligned with its budget and the budget is not exceeded. It is difficult to envisage a construction project being completed without cost variances and schedule delays, which may occur at any time during the procedure due to various factors such as poor management, supervision, and control [1]. Cost and time control is essential in the construction industry [2]. A construction project's success is determined by its ability to fulfill the client's cost, time, safety, resource allocation, and quality objectives. Time and cost overrun are common issues for the majority of construction projects [6, 7]. Cost overrun is a common theme in Iraq's construction industry. Despite the development of many cost control approaches and technologies, the Iraqi construction industry has yet to implement them [8]. This research contributes to the identification of the current reality of the Iraqi construction sector

DESIGN OF THE QUESTIONNAIRE
22 Security situation in the country
FACE VALIDITY
PILOT STUDY
Statistical Validity
QUESTIONNAIRE DISTRIBUTION
QUESTIONNAIRE DATA ANALYSIS
VIII. CONCLUSION
Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.