Abstract

PurposeA lack of reliable and effective communication tools poses major barriers impeding the performance of construction projects consisting of diverse participants. Although some construction project teams (CPTs) begin to apply social media (SM) as an available approach for project management the entire mechanism of SM adoption in this specific context remains understudied. Therefore, this study aims to adopt a CPT's lens to investigate the critical antecedents and associated effects underlying SM adoption in the construction industry.Design/methodology/approachBased on the technology–organization–environment (TOE) theory, a conceptual model was proposed and tested by empirical data collected from 159 CPTs in China. Structural equation modeling technique was employed for data analysis.FindingsThe results demonstrate that all the five extracted TOE-based antecedents including two technological factors (i.e. compatibility and expected cost), one organizational factor (i.e. top management support) and two environmental factors (i.e. project partner collaboration and project fit) are crucial to the adoption of SM in CPTs. Besides, SM acceptance is found to mediate the relationships between organizational and environmental factors and SM use. Moreover, SM use significantly predicts the communication effectiveness of CPTs.Research limitations/implicationsA questionnaire study based on cross-sectional data from China may only unveil the logic of SM adoption in the context of Chinese construction industry within a shorter time interval. It is recommended that future research could develop longitudinal studies among various construction practitioners in different countries to further specify and generalize the current findings.Originality/valueThis paper provides a comprehensive understanding of SM adoption in the construction industry by exploring the preadoption antecedents and postadoption effects from the perspective of project teams. The empirical findings advance the current web-based project management literature and afford new insights for construction practitioners into better managing SM application to reap its full capabilities in projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.