Abstract

Performance analyses of consultancy firms usually include man-hour analyses, schedule analyses and budget analyses. During the project management process, the project scope change makes it difficult for the management to control the project and predict the future trends. This research has developed a project performance measurement model based on the concepts of CAPP (Continuous Assessment of Project Performance) and PMBOK (Project Management Body of Knowledge), created by the Construction Industry Institute and PMI (Project Management Institute). Through data collection, analysis, and summary, this study establishes a historical database, reviews existing records, and selects major and significant performance evaluation indicators from the project data, as well as building of relevant models. Through an established Web-based project performance measurement system to identify the project implementation performance trend, it allows participants in various stages of the construction engineering life cycle to exchange and share engineering performance information and experience.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.