Abstract

This article sets out to investigate and rank the factors that affect labor productivity in the Egyptian construction industry. To achieve this, a quantitative research methodology is adopted and it entails the use of structured survey questionnaires. The data obtained was analysed using the relative importance index. The results from the analysis revealed ten major factors affecting labor productivity in the construction industry in Egypt. These factors are: tools and equipment shortages; delay in material delivery on site; payment delay; undisciplined labor; material shortage; rework; labor expensive and skills; low quality of raw material; waiting for equipment to arrive; and on-site accident. Consequently, these findings would serve as a useful tool and a basis to make recommendations to governmental and construction personnel regarding the productivity of labor in the Egyptian construction industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.