Abstract

We study a range of counterparts of the single-machine scheduling problem with the maximum lateness criterion that arise in the context of inverse optimization. While in the forward scheduling problem all parameters are given and the objective is to find the optimal job sequence for which the value of the maximum lateness is minimum, in inverse scheduling the exact values of processing times or due dates are unknown, and they should be determined so that a prespecified solution becomes optimal. We perform a fairly complete classification of the corresponding inverse models under different types of norms that measure the deviation of adjusted parameters from their given estimates.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.