Abstract
Spatially highly-resolved capacity expansion models are often simplified to a lower spatial resolution because they are computationally intensive. The simplification mixes sites with different renewable features while ignoring transmission lines that can cause congestion. As a consequence, the results may represent an infeasible system when the capacities are fed back at higher spatial detail. Thus far there has been no detailed investigation of how to disaggregate results and whether the spatially highly-resolved disaggregated model is feasible. This is challenging since there is no unique way to invert the clustering.This article is split into two parts to tackle these challenges. First, methods to disaggregate spatially low-resolved results are presented: (a) an uniform distribution of regional results across its original highly-resolved regions, (b) a re-optimisation for each region separately, (c) an approach that minimises the “excess electricity”. Second, the resulting highly-resolved models’ feasibility is investigated by running an operational dispatch. While re-optimising yields the best results, the third inverse method provides comparable results for less computational effort. Feasibility-wise, the study design strengthens that modelling countries by single regions is insufficient. State-of-the-art reduced models with 100–200 regions for Europe still yield 3%–7% of load-shedding, depending on model resolution and inverse method.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.