Abstract

Almost all inventory models assume that lead time is prescribed, regardless of whether it is deterministic or probabilistic, and thus is not subject to control. However, in many practical situations, lead time and setup cost can be reduced at added costs. This article combines the concept of capital investment allocated to reducing lead time and setup cost. This article explores the problem of a continuously reviewed inventory model, in which lead time, setup cost and order quantity are decision variables with permitted shortages. The correct total expected annual cost is derived, and a solution procedure is presented to determine the optimal order quantity, lead time and setup cost. Finally, to illustrate the solution procedure, numerical examples are provided.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.