Abstract

Abstract This paper addresses the selection of a reorder point under a management-specified, maximum expected duration of stockout during a replenishment lead time. The cases of normal and Poisson demand are considered. In both cases graphical aids are developed, allowing easy determination of the reorder point so as to achieve a desired service level. The entire probability distribution of the durations of stockouts is also developed in each case.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.