Abstract
In this paper, an invasive weed optimization (IWO) scheduling algorithm is presented for optimization no-idle flow-shop scheduling problem (NFSP) with the criterion to minimize the maximum completion time (makespan). Firstly, a simple approach is put forward to calculate the makespan of job sequence. Secondly, the most position value (MPV) method is used to code the weed individuals so that fitness values can be calculated. Then, use the global exploration capacity of IWO to select the best fitness value and its corresponding processing sequence of job by evaluating the fitness of individuals. The results of 12 different scale NFSP benchmarks compared with other algorithms show that NFSP can be effectively solved by IWO with stronger robustness.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.