Abstract
To ensure final product quality of nuclear classified heat exchanger tubes and satisfy requirement of batch process, RCC-M specification specify that prototype series qualification should be performed before manufacture. During qualification, manufacturing condition, technology process and technology parameters can be verified and solidified in order to establish manufacturing program. In the meantime,”defect catalogue” will be established by analyzing defects occurred in manufacturing. Finally, the aim of improving product quality and assure manufacturing process will be realized by qualification. How to perform qualification according to RCC-M specification with considering manufacturing process and test requirement of heat exchange tubes is also be presented in the article.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.