Abstract

With substantially increasing penetration levels of wind power, electric power system flexibility is needed to address the variability and uncertainty of wind power output. Thus, it has become an urgent issue to obtain an optimal tradeoff between economics and reliability, and to price system uncertainties. This paper proposes a new electricity market-clearing mechanism based on locational marginal prices (LMPs) for pricing uncertain generation and load. The uncertainty contained locational marginal price (U-LMP) is derived from a distributionally robust chance-constrained optimal power flow model in which only the first-order and second-order moments of the uncertain sources’ probability distribution are needed. Compared with traditional LMPs, the proposed U-LMP formulation includes two new uncertainty components: transmission line overload uncertainty price and generation violation uncertainty price. These LMP uncertainty components are the price signals reflecting the system costs as a result of wind generation and demand uncertainty at different locations. Finally, using parametric case studies, the relationship among uncertainty levels, system generation cost, and LMP uncertainty components are established. Case studies performed on the PJM 5-bus and IEEE 118-bus systems verify the proposed U-LMP method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.