Abstract

Recently, many engineering systems are modeled as interval systems. In this investigation, an interval model is obtained for Riverol-Pilipovik (RP) water treatment plant. A certain amount of uncertainty is considered in all parameters of different coefficients of the transfer function of RP water treatment plant. After obtaining the interval model for RP water treatment plant, model order reduction of transfer function is also accomplished. For model reduction, matching of time moments and Markov parameters in addition to minimization of errors in between time moments and Markov parameters is accomplished. The minimization is done using Jaya algorithm. The results show that the model is adequately approximating the interval modeled RP water treatment plant.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.