Abstract
The signalized intersection on Sultan Hamid II Road - Gusti Situt Mahmud Road – 28 Oktober Road – Selat Panjang Road is an intersection in Pontianak city with high traffic problems. The construction of the Landak parallel bridge initially aimed to reduce congestion, but this created an imbalance that caused congestion. This research analyses the performance of the intersection using the 1997 Indonesian Road Capacity Manual method and VISSIM software simulation. Data was collected in the form of intersection geometric data, traffic light cycle time, vehicle speed, and traffic volume taken for three days with a survey tool in the form of CCTV as a recorder at 06.00 - 18.00 WIB. Then, the data collected is processed into the basis of research to calculate the performance of the intersection in existing conditions and develop alternative improvement plans using MKJI 1997 and VISSIM software simulations. In the analysis with the MKJI 1997 method, the North road's service level is LOS C; the East road is LOS C; the South road is LOS B; the West road is LOS F, and the highest degree of saturation is 1.56. Analysis with VISSIM software simulation obtained the level of service of the intersection LOS C. After making alternative changes in cycle time, geometrics, and restrictions on the time of prohibition of passing obtained in alternative 15 with changes from signalized intersections to roundabouts and geometric changes.
Published Version (Free)
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.