Abstract

The explicit demand response (DR) is a key program for reinforcing the participation of end customers and making the most out of the potential of the smart grid. The DR is a key topic in the field of buildings to make use of the flexibility that they can offer. However, in order to guarantee the correct functionality of a DR system, it is fundamental to perform interoperability tests among the various components/actors. In this paper, we take into consideration the technological solutions suggested in the framework of the DRIMPAC project to enable the DR in buildings. We consider all actors/devices involved in order to reach the objective of executing a flexibility order by an asset. Following a structured interoperability testing methodology created by the Joint Research Centre, we perform interoperability tests regarding all critical links of the full chain of interacting actors to obtain the DR in buildings. The results show that the system functions properly and the benefits from the DR can be exploited. On the other hand, we provide a concrete example of how to apply the interoperability methodology in the field of testing the DR in buildings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.