Abstract

The interest factor to be included in equipment economic studies has not been properly explained in the past. A method, Market Value Maximization, is outlined for the correct calculation of the interest rate to be used in economic analyses. Example calculations are demonstrated and the applicability to the construction contractor situation is discussed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.