Abstract

ABSTRACTThis paper presents hybrid simulations of a three-span R/C bridge among EU, US, and Canada. The tests involved partners located on both sides of the Atlantic with each one assigned a numerical or a physical module of the substructured bridge. Despite the network latency in linking remote sites located on the two sides of the Atlantic the intercontinental hybrid simulation was accomplished and repeated successfully, highlighting the efficiency, and repetitiveness of the approach. Adaptations, challenges, and limitations are discussed, focusing on the implications of network communication latency, the insensitivity of the sub-structuring arrangement, and the accuracy of the results obtained.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.