Abstract

FREQUENCY conversion was determined as the best means of supplying differences between the 25-cycle and 60-cycle loads and generating abilities of the Union Electric Light and Power Company system. The hydroelectric plant at Keokuk, Iowa, was developed as a 25-cycle run-of-river plant to supply the 25-cycle load in that vicinity and to transmit power to St. Louis, where the load is largely 60 cycles. Various possibilities in 25-cycle and 60-cycle steam and hydroelectric plants presented themselves but a frequency converter was decided upon as the most desirable.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.