Abstract

Summary This paper describes a system that allows engineers to monitor and control a reservoir simulation run during its execution. The system consists of a 3D, three-phase black-oil reservoir simulator running simultaneously with an interactive graphics pre- and postprocessor. Previous authors have described systems that allow monitoring of job execution with simultaneous graphics displays; the system described here is unique in that the engineer can modify simulator and well-control parameters during the execution. While the system will be helpful in detection and correction of timedependent data problems, it will be very useful in optimizing reservoir management decisions in future performance projections. The system is implemented on an IBM-compatible 486 microcomputer with commercially available multitasking software, although it can be implemented easily on any microcomputer or workstation capable of multitasking. We show that implementation of the system required only a moderate amount of modification of the pre- and postprocessor and even less modification of the reservoir simulator.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.