Abstract

In this paper, we deal with actual problems on production and work force assignment in a housing material manufacturer and a subcontract firm. We formulate two kinds of two-level programming problems: one is a profit maximization problem of both the housing material manufacturer and the subcontract firm, and the other is a profitability maximization problem of them. Applying the interactive fuzzy programming for two-level linear and linear fractional programming problems, we derive satisfactory solutions to the problems. After comparing the two problems, we discuss the results of the applications and examine actual planning of the production and the work force assignment of the two firms to be implemented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.