Abstract

Cycling as a green transportation mode has been promoted by many governments all over the world. As a result, constructing effective bike lanes has become a crucial task to promote the cycling life style, as well-planned bike lanes can reduce traffic congestions and safety risks. Unfortunately, existing trajectory mining approaches for bike lane planning do not consider one or more key realistic government constraints: 1) budget limitations, 2) construction convenience, and 3) bike lane utilization. In this paper, we propose a data-driven approach to develop bike lane construction plans based on the large-scale real world bike trajectory data collected from Mobike, a station-less bike sharing system. We enforce these constraints to formulate our problem and introduce a flexible objective function to tune the benefit between coverage of users and the length of their trajectories. We prove the NP-hardness of the problem and propose greedy-based heuristics to address it. To improve the efficiency of the bike lane planning system for the urban planner, we propose a novel trajectory indexing structure and deploy the system based on a parallel computing framework (Storm) to improve the system's efficiency. Finally, extensive experiments and case studies are provided to demonstrate the system efficiency and effectiveness.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.