Abstract
The paper considers an interactive search over a non-dominated solution space of a multiple-criteria project scheduling problem. The approach described handles quite a general class of non-preemptive project scheduling problems with renewable, non-renewable and doubly constrained resources, multiple performing modes of activities, precedence constraints in the form of an activity network and multiple project performance criteria of time and cost type. The approach consists of two stages. In the first stage, a large representative sample of approximately non-dominated schedules is generated by the Pareto Simulated Annealing (PSA) metaheuristic method. Then, in the second stage, an interactive search over the sample is organized by the `Light Beam Search' (LBS) procedure in its discrete version.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.