Abstract

Risk management is known as a process of properties maintenance and the ability in money making and value engineering and management is an inseparable part of risk management. Unified value management and risk management establishes synergy. This study is done with the intention of studying interactional function of value engineering and risk management in civil projects while Dallas model is considered as theoretical model. In this study implementation of value engineering and risk management was done in a unified practical way. Findings indicate that implementation of his model in construction phase of building project will lead to decrease in approximately certain costs as much as 24.77% while project temporary delivery and finalising the project are getting near, decrease rate of final costs will reach 21.32%. After procedures and studying results of tables, it can be concluded that interactional function of risk management and value engineering in this project was accompanied with 7.35% of savings.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.