Abstract

Taking the phase III project of Xi'an Metro Line 1 as the research background, the finite element model of single-track tunnel construction and double-track tunnel construction at the same time is established, and the relationship between the vertical displacement of soil and segment and the internal force of segment is obtained. The results show that: 1) when the double-track tunnel is constructed at the same time, the maximum vertical displacement of soil and segments is less than that of the single-track tunnel; 2) when the double-track tunnel is constructed at the same time, the internal force of the segment is greater than that of the single-track tunnel.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.